As discussed with the Head of Manufacturing and KPMG team following points were noted yesterday:


1. Operation-wise Labor resources should be captured (if project timeline does not require an extension).

2. Operation-wise Overtime rates should be captured (if project timeline does not require an extension).

3. Expenses relating to Operations Services Division -OSD should be out of the Manufacturing expenses.

4. Expenses relating to IBD should be out of Manufacturing expenses.

4. Fixed Assets of Packing Operations should be re-arranged and splitted into four following groups:

(a) Primary Packing (Sterile)

(b) Secondary Packing (Sterile)

(c) Packing (Non-Sterile)

(d) Packing (Sterile )


Overtime and Night Labor should be well defined to avoid confusion in recording transactions.

Data Masters, Fixed Assets, G/L will be awaiting until further directives upon discussion.